We were commissioned to replace an old fence that ran down the side of the Clywedog dam on very steep ground.

Over 90% of the 525 meters of new fencing was constructed by hand, where only a small portion of the fence was accessible with machine.

A real test of our skills!

The Llyn Clywedog is a man made reservoir formed by the construction of the Clywedog Dam. The dam was built between 1965-67 to regulate the flow of water in the Severn, both as a protection against flooding of the upper sections of the river during the winter months and also to ensure the maintenance of a minimum flow in the river during the summer.

The construction of the dam and lake throw up a number of interesting statistics. The structure is the tallest mass concrete dam in Britain, standing fully 236 ft (72m) high. It is 750 ft long, and holds back some 11,000 million gallons of water. This apparently equates to some 550 million baths, or 264 billion glasses of water. The weight of concrete used in the construction of the dam is equal to 7 times the tonnage of the QE2 cruise liner, in all some 200,000 cubic metres; enough to build 28 miles of six lane motorway.

manual override of alt text
manual override of alt text
manual override of alt text
Quote Builder Tool

Use our quote builder tool to plot out your fence on a map and submit any specifications to help get an accurate quote.